Product information management took a new step forward with Vault-Sovelia solution

Metos

The introduction of the new ERP-system operated as a driver for acquiring a PLM solution.

The introduction of the new ERP-system operated as a driver for acquiring a PLM solution.

 

” In the past, the designer made drawings of the parts for production and DXF files for cutting. Now the drawings produced by the designers are created into the necessary file formats automatically. This reduces the risk of errors significantly. When parts are added to the assembly within Inventor, a bill of material is created to Sovelia automatically. The drawings made in the design phase are managed in Autodesk Vault and after the design is completed the product is approved for production in Sovelia. This is to ensure that the BOM’s and items are transferred to the ERP in a controlled way.

 

Metos Group manufactures and markets professional kitchen equipment from the brands Metos, Hackman and Wexiödisk. Metos is the market leader in the Nordic and Baltic countries as well as in the Benelux countries. Metos is a member in the ALI group, which is Europe’s leading manufacturer of professional kitchen equipment. Metos offers kitchen solutions thought out from start to finish. The planning starts from
the recipes and kitchen design, and Metos’ in-house made and trading products are used in the implementation. After sales take care of maintenance and spare parts.

”Our production is largely traditional sheet metal manufacturing, which is associated with the control electronics and the connection of the electricity to the entity, says Tero Kähärä, Product Design Manager at Metos Oy Ab

Leave us a message

Vi gemmer dine personoplysninger for at behandle din tilmelding. Læs mere i vores Privacy Policy om, hvordan vi behandler dine personlige data, og hvilke rettigheder du har.

Relaterede cases


Udnyt alle fordelene ved BIM med klassifikation af data

Det nye OUH (Odense Universitetshospital) er hidtil det største nybyggede sygehusprojekt i Danmark. Det er et offentligt byggeri, hvilket betyder, at det for projektet er et lovkrav at BIM-modeller klassificeres jf. IKT-bekendtgørelsen 118 af 06-02-2013.

Læs mere

Arkitekters digitale agenda og IKT-krav

Hvordan skaber I et sammenhængende projektmateriale, som lever op til de krav, der stilles fra fx AB18 & YBL18? - Det er tid til at få den digital agenda på tegnebrættet og se på softwareløsningers muligheder for at skabe ”entydighed” og ”sammenhæng” imellem model, tegninger, beskrivelser og tilbudsliste.

Læs mere

The City of Helsinki - Pioneers introducing BIM

When designing professional kitchens for the 650 professional and public kitchens in Helsinki, there was no doubt in the minds of the architects Seppo Kupari, the designer and Mikko Soininvaara, the BIM Manager from the city of Helsinki’s Public Works Department, that they had to make the transition from 2D to 3D and BIM.

Læs mere